Sunday, 6 May 2012

Moving into the Shed

Finally I have been able to move some things into the shed. In the week after Stawell, Lach and Cal worked hard to get the roof on the shed. Mick Tomlinson (plumber) finished off the roof by installing the flashing, which made the shed waterproof. Stephen and I invested in a good quality storage system which was very easy to put together and.........finally I was able to get all the boxes out of the study, spare bedroom and bathroom.


As you can see from the photos below there is still a lot to be done before we get our pergola area and backyard back in order.




No comments:

Post a Comment

Note: only a member of this blog may post a comment.